English
|
Malay
Laman Utama
Profil Syarikat
Objektif & Sejarah Syarikat
Kenali Kami
Lembaga Pemegang Amanah
Pengurusan Tertinggi
Struktur Organisasi
Direktori
Produk & Servis
Penyelidikan & Pembangunan (P&P)
Potongan Cukai Berganda
Perundingan & Penglibatan Industri
Penilaian
Ujian Makmal
Pemeriksaan & Persampelan
Forensik
CPA/Pendapat Teknikal
Sistem Pengurusan Kualiti Kontraktor
Penerbitan Jurnal
MCRJ
Penerbitan
Jurnal Penyelidikan Pembinaan Malaysia (MCRJ)
Penyelidikan & Pembangunan
Manual / Garis Panduan
Kualiti, Keselamatan & Profesionalism
Produktiviti
Building Information Modelling (BIM) - BM
Industrialised Building System (IBS) - BM
Geran Penyelidikan Antarabangsa
CREAM E-Majalah
CREAM E-Majalah 2023
Bahan Seminar dan Bengkel
Laporan Pendapat Teknikal
Pelan Strategik Pembinaan (2021-2025)
Acara & Aktiviti
Kalendar 2024
CREAM Webinar Siri 2024
Buletin
Berita & Pengumuman
Integriti & Governans
Galeri
Hubungi
Maklumat Perhubungan
Borang Pertanyaan
Kerjaya
Pensijilan Kelulusan
laptop
Desktop View
Copyright 2024 by Construction Research Institute of Malaysia (CREAM) 200401008385 (646889-V)
home
>
Penerbitan
>
Penerbitan
>
Jurnal Penyelidikan Pembinaan Malaysia (MCRJ)
>
Isu Biasa
>
MCRJ Jilid 20 No. 3 2016
MCRJ Volume 20 No. 3 2016
Format
Hardback / 117 pages
ISSN Number
1985 - 3807
Download PDF
Tanya
Please enter valid quantity.
Penerangan Produk
Welcome to the twentieth (20th) issue of Malaysian Construction Research Journal (MCRJ). In this issue, we are pleased to include six papers that cover wide range of research area in construction industry. The editorial team would like to express our sincere gratitude to all contributing authors and reviewers for their contributions, continuous support and comments.
In this issue:
Romziah Azit and Mohd Ashraf Mohamad Ismail evaluate the rock burst phenomenon at the Pahang-Selangor Raw Water Transfer Tunnel. Stress-strength method was used to analyse the tunnel behaviour under high overburden stress based on strength factor and tangential stress. Analysed results show that section with high overburden have high possibility of rock burst. Furthermore, it allows a reasonable prediction of the tunnel behaviours under different rock conditions, support systems and overburden stress which serves as a tool in the observational design and construction method for the deep tunnel excavation.
Anda mungkin berminat ...
MCRJ Volume 27 No. 1 2019
MCRJ Volume 8 No. 1 2011
MCRJ Volume 17 No. 2 2015
MCRJ Volume 23 No.3 2017
MCRJ Volume 41 No.3 2023
MCRJ Volume 1 No. 1 2007
Call Us Now
+603-2779 1479
Our Certifications
CERTIFIED TO ISO 9001: 2015
CERT.NO. : QMS 02376
CERTIFIED TO ISO 9001: 2015
CERT.NO. : QMS 02376
CERTIFIED TO ISO 9001: 2015
CERT.NO. : QMS 02376
CERTIFIED TO ISO 37001 : 2016
CERT.NO. : ABMS 00287
CERTIFIED TO ISO 37001 : 2016
CERT.NO. : ABMS 00287
Main Office (HQ)
Level 14, CIDB 520, The Met Corporate Towers, No 20, Jalan Dutamas 2, 50480 Kuala Lumpur, Malaysia
+603-2779 1479 / +603-2779 1474
general@cream.my
Branch Office (Testing Laboratory)
Makmal Kerja Raya Malaysia, Lot 8, Seksyen 91, Jalan Chan Sow Lin, 55200 Kuala Lumpur
Kompleks CIDB, Jalan Sultan Tengah, 93050 Kuching, Sarawak, Malaysia
Lot 4, Industrial Zone 15, Kota Kinabalu Industrial Park, 88460 Kota Kinabalu, Sabah, Malaysia
+603-9212 0165
mkrm@cream.my
Copyright 2024 by Construction Research Institute of Malaysia (CREAM) 200401008385 (646889-V)
Webteq | Web Design Johor Bahru
Google Site Search