English
|
Malay
Laman Utama
Profil Syarikat
Objektif & Sejarah Syarikat
Kenali Kami
Lembaga Pemegang Amanah
Pengurusan Tertinggi
Struktur Organisasi
Direktori
Produk & Servis
Penyelidikan & Pembangunan (P&P)
Potongan Cukai Berganda
Perundingan & Penglibatan Industri
Penilaian
Ujian Makmal
Pemeriksaan & Persampelan
Forensik
CPA/Pendapat Teknikal
Sistem Pengurusan Kualiti Kontraktor
Penerbitan Jurnal
MCRJ
Penerbitan
Jurnal Penyelidikan Pembinaan Malaysia (MCRJ)
Penyelidikan & Pembangunan
Manual / Garis Panduan
Kualiti, Keselamatan & Profesionalism
Produktiviti
Building Information Modelling (BIM) - BM
Industrialised Building System (IBS) - BM
Geran Penyelidikan Antarabangsa
CREAM E-Majalah
CREAM E-Majalah 2023
Bahan Seminar dan Bengkel
Laporan Pendapat Teknikal
Pelan Strategik Pembinaan (2021-2025)
Acara & Aktiviti
Kalendar 2024
CREAM Webinar Siri 2024
Buletin
Berita & Pengumuman
Integriti & Governans
Galeri
Hubungi
Maklumat Perhubungan
Borang Pertanyaan
Kerjaya
Pensijilan Kelulusan
laptop
Desktop View
Copyright 2024 by Construction Research Institute of Malaysia (CREAM) 200401008385 (646889-V)
home
>
Penerbitan
>
Penerbitan
>
Jurnal Penyelidikan Pembinaan Malaysia (MCRJ)
>
Isu Biasa
>
MCRJ Jilid 9 No. 2 2011
MCRJ Volume 9 No. 2 2011
Format
Hardback / 96 pages
ISSN Number
1985 - 3807
Download PDF
Tanya
Please enter valid quantity.
Penerangan Produk
Welcome to the ninth issue of Malaysian Construction Research Journal (MCRJ). The editorial team would like to extend our gratitude to all authors and reviewers for their continuous contributions and valuable comments. It is hope that the readers will fi nd benefi cial information from this edition of MCRJ. 6 papers are discussed in this issue.
Mohd Nasrun Mohd Nawi, et. al. review the concept of team integration in Industrialised Building System (IBS) project. In this paper, the concepts of team, teamwork and integration within scope of construction project is reviewed and defi ned. The main dimensions that describe a team that has been fully integrated, followed by discussion on how the delivery team a responsible for the design and construction of a project can be integrated to work together is also discussed.
Anda mungkin berminat ...
MCRJ Volume 26 No. 3 2018
MCRJ Volume 43 No.2 2024
MCRJ Volume 30 No. 1 2020
MCRJ Volume 3 No. 2 2008
MCRJ Volume 33 No. 1 2021
MCRJ Volume 18 No.1 2016
Call Us Now
+603-2779 1479
Our Certifications
CERTIFIED TO ISO 9001: 2015
CERT.NO. : QMS 02376
CERTIFIED TO ISO 9001: 2015
CERT.NO. : QMS 02376
CERTIFIED TO ISO 9001: 2015
CERT.NO. : QMS 02376
CERTIFIED TO ISO 37001 : 2016
CERT.NO. : ABMS 00287
CERTIFIED TO ISO 37001 : 2016
CERT.NO. : ABMS 00287
Main Office (HQ)
Level 14, CIDB 520, The Met Corporate Towers, No 20, Jalan Dutamas 2, 50480 Kuala Lumpur, Malaysia
+603-2779 1479 / +603-2779 1474
general@cream.my
Branch Office (Testing Laboratory)
Makmal Kerja Raya Malaysia, Lot 8, Seksyen 91, Jalan Chan Sow Lin, 55200 Kuala Lumpur
Kompleks CIDB, Jalan Sultan Tengah, 93050 Kuching, Sarawak, Malaysia
Lot 4, Industrial Zone 15, Kota Kinabalu Industrial Park, 88460 Kota Kinabalu, Sabah, Malaysia
+603-9212 0165
mkrm@cream.my
Copyright 2024 by Construction Research Institute of Malaysia (CREAM) 200401008385 (646889-V)
Webteq | Web Design Johor Bahru
Google Site Search